Correction: The resurfacing of 60th between Etowah and Maguire will begin 9/14/26 thru 9/18/26. Thank you for your cooperation.

Fri, 11 Sep 2026 17:26:11 GMT

Installation of 4-Way Stop Control is scheduled for 08/27/2026 at the intersection of Etowah Road and 60th Street.

Changes will include “STOP” signs with all-way plates on all approaches, as well as “Stop Ahead” signs on all approaches to the intersection. Existing “Cross Traffic Does Not Stop” plaques well be removed during the conversion. Flags will be added temporarily to all new signs to bring attention to the control changes.

Please contact Noble City Hall at (405) 872-9251 #3 on the menu with any questions.